How a denim order is developed: how long a sample takes and who pays for it, how bulk timing runs from the deposit date, and how size runs, grading and tolerances are set against your own spec sheet.
A sample is developed against the style details, the wash route and the size run you confirm. The clock starts when those three are settled in writing, not when the first email arrives.
| Item | Detail |
|---|---|
| Sample lead time | 10 working days |
| Sample cost, first two pieces | Covered by us |
| Sample cost, beyond two pieces | Paid by the buyer, at the sample charge quoted with the order |
| Approval criteria | Size tolerance, shade and hand feel, judged against your own standard |
| If a sample fails | Remake cycle agreed with you on the same standard before the remake starts |
Bulk timing is set by quantity. The figures below count from the date the deposit reaches us, so the deposit date is the one date worth putting in your own calendar.
| Quantity | Working days | What it covers |
|---|---|---|
| 300 pcs | About 20 | Production, inspection and shipping |
| Larger runs | Quoted per order | Timing is fixed with the wash route and the packing plan |
The deposit date, not the enquiry date. A deposit received on Friday starts the count the same week; a missing size breakdown stops it.
Wash route, packing method and the number of colors. A single-color run moves fastest; a five-color run adds a wash batch per color.
The 20 working days for 300 pieces already include inspection and shipping, so there is no separate QC or dispatch tail to add on.
Five items decide whether a reply is a real price or a range. Send all five in the first message and the number that comes back is one you can plan a season around.
The runs below are the ones our patterns are cut for. Both jeans runs can be extended, and the extension is decided before the pattern is made rather than after the first cutting.
| Category | Current run | Can be extended to |
|---|---|---|
| Women's jeans | 26–32 | 34 |
| Men's jeans | 28–40 | 42 and above |
| Denim jackets and blazers | XS–XL | Agreed per style |
| Denim skirts | 26–32 | Agreed per style |
| Denim dresses | XS–XL | Agreed per style |
| Denim shorts | 26–32 | Agreed per style |
A grade is three numbers per step: how much the waist, the hip and the inseam move between consecutive sizes. Those three numbers come from your chart, because a grade built for a European chain and a grade built for a US boutique are not the same garment.
| Input | How it is set |
|---|---|
| Base size | Your base size, or the middle of your run if you sell a spread |
| Waist increment | From your grade, adjusted to what the pattern can hold |
| Hip increment | From your grade, checked against the rise and the leg opening |
| Inseam increment | From your grade, or held flat if you keep one length |
| Confirmation | Answered before the pattern is made, not after the sample arrives |
Every measurement on the approval sheet carries an allowance for cutting, sewing and wash shrink. Those allowances are agreed with you before the sample is made, and the signed sheet becomes the standard that inspection measures against.
| Measurement | Allowance | How it is measured |
|---|---|---|
| Waist | Set with you | Garment buttoned, laid flat, tape straight across the top of the waistband, doubled for the circumference |
| Inseam | Set with you | From the crotch seam to the hem along the inner leg, on the same garment |
| Leg opening | Set with you | Flat across the hem, doubled, on a garment that has been washed |
| Centimetres | Rounded to the nearest cm | 1 in = 2.54 cm, converted once rather than per size |
Measuring points follow your sheet, not ours. If your sheet takes the chest of a jacket below the armhole instead of at it, or measures a skirt from the side seam rather than the top of the waistband, that definition is written onto the approval sheet and inspection measures to it.
10 working days from the point where the style details, wash route and size run are confirmed in writing. Complex washes and new patterns are quoted with their own sample date before the work starts.
The production side covers the first two pieces. Every piece above two is paid by the buyer at the sample charge quoted with the order.
The sample is judged against your own standard for size tolerance, shade and hand feel. If it fails on any of the three, the redo cycle is agreed with you on the same standard before the remake starts.
It depends on quantity. 300 pieces take about 20 working days including inspection and shipping, counted from the date the deposit reaches us. Larger runs are quoted with their own schedule before the order is booked.
Women's jeans run 26 to 32 and can be extended to 34; men's jeans run 28 to 40 and can be extended to 42 and above. Waist, hip and inseam increments are set from your own grade, and we confirm what the pattern can hold before sampling.
Send the tech pack, your size chart and the target quantity. You will get the sample date, the sample charge and the bulk schedule back against those three.